Cement Bond Log (CBL) Logging Services Tools

 Cement Bond Log (CBL) Logging Services Tools

Model No.︰ Cement Bond

Brand Name︰-

Country of Origin︰-

Unit Price︰-

Minimum Order︰-

Inquire Now

Product Description

Cement Bond Log (CBL) Logging Services tool

Accurate Cement Evaluation In Any Downhole Environment

 

CBL cement bond logging tool

CBL cement bond logging tool include: the cement bond logging CBL, VDL, CCL, GR, NGR (neutron-gamma) , which can measure and record : variable density, acoustic amplitude, magnetic orientation, natural gamma, neutron-gamma Ma-etc. ,total five kinds curves, to check the quality of  well cementation and find other leak problems.

       CBL series 's diameter are Φ43, Φ51, Φ60, Φ73, Φ89, etc., and the outer diameter of Φ43 and Φ51 's  CBL cement bond logging tool is more suitable for windows, sidetrack  or horizontal wells.

       The meter can be a single or multi-core transmission, it can be AC or DC power supply.

 

● temperature: 150℃/175℃;

       ● Pressure: 100MPa/140Mpa;

       ●Outer diameter: Φ43, Φ51, Φ60, Φ73, Φ89mm;

       ● Length: <6.5m;

       ● speed: 600 m / h;

       ● Power: AC or DC;

        ●Radioactive statistical fluctuation error: natural gamma 7%, the neutron gamma 4%;

       ● neutron - gamma source distance: 60cm.

 

Functions and Features

     Casing collar locator CCL include :  wound coil which is winding on a soft iron core and 2 permanent magnets. when it passed casing collar, it will have approximately 1Hz frequency signal  in the coil's 2 ends , after the treatment of the electic circuit , it will be added to the single-core cable ,then it will be sent to the ground system, with a certain treatment and be recorded , working with the CBL logging, providing accurate depth. 

      Acoustic sound CBL cement bond logging tool CBL is a dual-emission & double receiving  sound system , the source distance is:  three feet , 5 feet. Well surface system  record: transmission time TT (3 'Sourceistance), casing signal amplitude , full waveform shape(variable density recording VDL ,5' Source distance) at the same time, to check the quality of well cementing and find missing and channeling

 

 

Instrument measuring principle 

    The main task of the cement bond logging tool is check the cement bond quality between the casing and formation, including:  

cementing quality of first cemented surface - cementation situation  of cement and casing ,

cementing quality of second cemented surface - cementation situation  of cement and  formation .

    Cement bond logging tool can measure 4 curves: CCL curve, GR curves, acoustic amplitude curves and variable density curves.

The basic principle is as below :the cement and mud 's acoustical impedance have a big difference , it fluence attenuation of sound waves when transmitting along the tube axis , so to Reflect the Cementation quality  of the cement and casing . the  cement bond logging tool have an acoustic transmitter and a receiver ,the transmitter and receiver have a distance . When the acoustic transmitter  emitted sound waves , the receiver receives sigals,the signals include : casing wave ,formation wave , mud wave.

For cased well, when well casing ,the outside(Peripheral) is cement; if is not well casing , the outside(Peripheral) is mud , or part is mud/slurry . Since the acoustic impedance of mud have a big difference with casing , so the first wave amplitude of casing is closely realted with cementation Quality.

In the acoustic amplitude  logging, the non-cemented casing section  is called free casing; if with Cement consolidation,Casing wave amplitude will be Obviously decreased. 

Therefore, the amplitude(range) of casing wave attenuation or attenuation measurements ,it could show the Cementation condition of cement and casing ,and  indicating a high cement returns.

     Most people are interested in variable density logging ,because  it reflects the second cemented surface, that is cementing condition of  cement and  formation .

the second cementing condition will affect Formation wave Strength of Receiving acoustic signals .Because acoustic energy  that from cement to formation , it is decided/depend by  Acoustic coupling condition between the two .Through signals-strength analysis : the casing wave and the of the formation wave ,can easily see the following three conditions:

1. For freed casing: casing wave amplitude is big , wave formation is weak. 

2. For the casing and cement, cement and formation are cemented with good situation: casing wave amplitude is small, the formation wave is big. 

3. For casing and cement consolidation is with well condition, cement and formation is unconsolidated : casing wave's amplitude is small, the formation wave 'samplitude  is s,some times you can not find/discover formation wave.

Thus, the wave formation strength of the receiving signal  is a measurement of the quality of the second cemented surface. see the Whole Well, casing wave's  arrival time is basically stable and unchanging, But due to difference of formation  instrument that encountered , the formation wave 's arrival time will Obviously change .This feature of casing wave and formation  wave is providing two good constions when Variable density logging to identify and distinguish  the two waves.

Natural gamma logging is to measure formation 's natural radioactivity.

formation 's natural radioactivity is caused by the Uranium, thorium, potassium and other radionuclides of the rock .aggregation of these Radionuclide  in the formation  is related with Depositional environment of formation .Therefore, the measurement of natural radioactivity can learn something about the formation geological questions. Whether casing wellor openhole well ,both could use Natural gamma well logging . Natural gamma logging tool can be combined with any other logging tools to downhole . Therefore, another important use of natural gamma logging is for stratigraphic correlation. In the cement bond logging, the main purpose of natural gamma logging tool is to regulate the depth .

CCL logging is used to determine the location of casing collar.